November-Jan 2016...Groundworks for factory extension at Stackright in Skelmersdale inc all associated drainage, strustural foundations, retaining walls and flooring. 

January...Foundation for new detached home and sewer connection, Bradshaw, Bolton

February...Foundations and drainage for 2 seperate domestic extensions, Manchester and Warrington, at Warrington we had to divert the entire existing sewer system

March--Present...Groundworks for 5 large detached homes, Chorley Old Rd, Horwich, Bolton, (opp Bob Smithy) inc all associated footings, temporary roads, main culvert diversion and re-connection inc new dragout for proposed combined sewer connection.  

July--September...Groundworks for various 6&7m high desplay screens around the Trafford Centre in Manchester, inc all associated excavations and structural concrete for ADXBA Ltd 

October-December...Start of relaying of 1500m2 concrete yard area for Pentre Group in Lowton, Warrington. The existing concrete yard areas are in poor condition and forklifts struggle loading and unloading

October...Deep sewer connection for Gary Flitcroft Developments at Eldon St, Bolton, here we connected a new 150mm combined sewer from 14 new homes into an existing 450mm pipe 4.2m deep in the highway

November/December....Surface and foul sewer connections into 2 seperate chambers in the highway, 2.1m and 3.2m depth both on 150mm steel ductile internal dropshaft connections, we also gained all onsite groundwork, drainage, kerbing and hard landscaping on a new industrial unit in Whitehills Id Park, Lytham st Annes for JVS Projects Ltd of Bury

December...Combined 150mm sewer connection for JIJ Developments Ltd at Platt Bridge near Wigan. No existing UU manhole available here so we had to construct a brand new manhole on an existing 225mm pipe in the highway and connect the new 150mm into it from the new development of 3 houses.